Photo

 Gasification of 700 m2 residential house in Moscow region. There were used 5000L and 2250L gas tanks  You can wait for the main gas pipe line for 3-4 years. Independent gas supply is realized during 1 day  Ground works for gas tank and gas pipe line have realized during 2 days by efforts of 5 people  Underground installation of branded gas pipeline. Supposed operating life is more than 150 years  To provide the safest gas tank removal from the crane of the manipulator it’s required to pull out its arm as high as it’s possible
Ждите. Идет загрузка...
  •  Gasification of 700 m2 residential house in Moscow region. There were used 5000L and 2250L gas tanks
  •  You can wait for the main gas pipe line for 3-4 years. Independent gas supply is realized during 1 day
  •  Ground works for gas tank and gas pipe line have realized during 2 days by efforts of 5 people
  •  Underground installation of branded gas pipeline. Supposed operating life is more than 150 years
  •  To provide the safest gas tank removal from the crane of the manipulator it’s required to pull out its arm as high as it’s possible
 
 
43402 
views
 
 
 


Cart  

No products

Total 0,00 €

Check out

Site Search

© 1998-2017 GC "Terrikom". All rights reserved.

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Crediting
 X
Закажите обратный звонок

Наш сотрудник позвонит и ответит на ваши вопросы. Это быстро и бесплатно!

Заказать звонок