Product comments

 
 
 
Газгольдер подземный вертикальный

Vertical underground gas tank

2250 litre

Comments (64)
 
 

 
Ржешевская Анна Александровна
30.05.2017




An english version is not available
 
 

 
Прокин Сергей Михайлович
24.08.2016




An english version is not available
 
 

 
Усков Александр Андреевич
21.07.2016




An english version is not available
 
 

 
Приходько Вадим Николаевич
21.10.2015




An english version is not available
 
 

 
Цейтлин Борис Львович
15.09.2015




An english version is not available
 
 

 
Макарова Елена Анатольевна
28.08.2015




An english version is not available
 
 

 
Абрамов Александр Владимирович
01.06.2015




An english version is not available
 
 

 
Kalyaev Alexander Vyacheslavovich
01.12.2014
Client Kalyaev A.V. (Order №3824-2, Maloye Kurapovo village, Taldomsky district, Moscow region, RUSSIA) gave “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Fomichev Eugeny Alexandrovich
25.11.2014
Client Fomichev E.A. (Order №3812-1, Zagryazhskaya village, Orekhovo-Zuevsky district, Moscow region, RUSSIA) gave “5” and left comments:

Positive: 
During short period of exploitation there are no any claims.

Suggestions: 
 -
Negative: 
 -
 
 

 
Stolyankov Andrey Vladislavovich
20.11.2014
Client Stolyankov A.V. (Order №3816-1, Posedkino village, Mytischinsky district, Moscow region, RUSSIA) gave “5” and left comments:

Positive: 
 -
Suggestions: 
To tighten full-service coordination according to the order in general. Proactive work management.

Negative: 
 -
 
 

 
Kirizliev Ivan Dmitrievich
12.11.2014
Client Kirizliev I.D. (Order №3819-2, Poryadino village, Naro-Fominsky district, Moscow region, RUSSIA) gave “3”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Kondrashova Tatiana Vladislavovna
05.11.2014
Client Kondrashova T.V. (Order №3775-2) gave “4”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Kulibabin Vadim Alexandrovich
04.11.2014
Client Kulibabin V.A. (Order №3588/1-18, Zelenogradsky town,Pushkinsky district, Moscow region, RUSSIA) gave “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Uzeneva Anastasiya Andreevna
24.09.2014
Clien Uzeeva A.A. (Order №3742-1, Odintsovsky district, Moscow region, RUSSIA) gave mark “5” and left comments:

Positive: 
Thank you for well-done work!

Suggestions: 
 -
Negative: 
 -
 
 

 
Andrey
06.09.2014
Positive: 
During the winter all butane and other fractions really burn out up to 0% mark of lever meter. Gas pressure is stable up to complete emptiness of the barrel even when the boiler operates with full power. This is the third year when my neighbor has been using what is known “Czech” horizontal gas tank with extended necktube. As a result, each winter gas really suddenly “finished“ at minimum rate indicated on the detector 12% for the first time and 17% and 23% in the following winters. First, he thought that that was indicator which didn’t work correctly. But charging it to have gas completely worked out after summer is over. And what do you think? Summer indicator read out at the moment of gas exhaustion were 0-1%. My vertical Antonio Merloni has been “dying” for two consecutive years now when the arrow of the detector “is off the scale”, lower than 0%. So, whether it is marketing or not, I don’t regret that I bought this vertical barrel for the price which is little bit lower than the price of neighbors’ gas tank although almost twice smaller that the neighbors’ one. Recently I found an office which charges supposedly almost only by butane which has significantly higher heat output than propane. Of course, I cannot make lab confirmation of gas composition at home. But thanks to statistics of use we’ll check if it’s really pure butane. But neighbor’s butane always stays unburnt in the barrel.

Suggestions: 
 -
Negative: 
 -
 
Editor answer:
We appreciate your high opinion about our equipment! Hope that in the future you will get only positive emotions using gas tank from Antonio Merloni.
 
 

 
Kalashnikov Eugeny Igorevich
26.08.2014
Client Kalashnikov E.I. (Order №3723/1-2, Korytovo village, Kirzhach, Vladimir region, RUSSIA) gave mark “5”. No comments

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Starostin Segey Alekseevich
13.08.2014
Client Starostin S.A. (Order №3718-1, Strygino village, Ruzsky district, Moscow region, RUSSIA) gave mark “4” and left comments:

Positive: 
Everything is fine

Suggestions: 
 -
Negative: 
 -
 
 

 
Hohlachev Anatoly Vladimirovich
31.07.2014
Client Hohlachev A.V. (Order №3711-1, Koryakino village, Schelkovsky district, Moscow region, RUSSIA) gave mark “4”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Sobolev Anton Victorovich
24.07.2014
Client Sobolev A.V. (Order №3701-2, St.Petersburg, RUSSIA) gave mark “4” and left comments:

Positive: 
Everything is good

Suggestions: 
 -
Negative: 
 -
 
 

 
Kurushin Aleksey Vladimirovich
15.07.2014
Client Kurushin A.V. (Order №3689-1, Verevskoye village, Solnechnogorsky district, Moscow region, RUSSIA) gave mark “5”. No comments

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Yanbuhtina Tatyana Anatolyevna
25.02.2014
Client Yanbuhtina T.A. (Order №3655-1, Yamuga town, Klin district, Moscow region, RUSSIA) gave mark “5” and left comments:

Positive: 
Gas tank is situated on the lot ideally; it takes not too much space; convenient and simple maintenance.

Suggestions: 
 -
Negative: 
 -
 
 

 
Koryagin Mikhail Mikhaylovich
27.12.2013
Client Koryagin M.M. (Order №3639-1, Ryzhevo village, Egoryevsky district, Moscow region, RUSSIA) gave mark “4”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Solntsev Eugeny Borisovich
28.11.2013
Client Solntsev E.B. (Order №3609-1, Seredneva village) gave mark “3”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Nehorosheva Tatiana Ivanovna
20.11.2013
Client Nehorosheva T.I. (Order №3602-2, Troitsa village, Istrinsky district, Moscow region, RUSSIA) gave mark “2” and left comments:

Positive: 
Installation was organized fine but it’s very bad that the company doesn’t realize boiler start-up (we have Vitogaz 100 boiler). It appears that we the gas tank is installed but should be started-up by other people. We are still agonizing.

Suggestions: 
If you are realizing installation of gas tanks, the start-up should be also taken upon yourselves. In bade case it comes that there is no any responsibility for the final result. We installed very good think and now are agonizing.

Negative: 
Gas is supplied but sometimes there is a popping happens and gas starts to be supplied from only one nozzle. We are obliged to turn the boiler off and start it up again.
 
Editor answer:
Dear Tatiana Ivanovna! In the list of services which our company renders there is also a service of starting-up and adjustment for gas equipment. You instructed us only for gasification what was realized in full measure. Also our engineer, according to the additional agreement, made site-on visit and pointed at crude errors made during smoke duct mounting what could cause complete impossibility for correct boiler operating.
 
 

 
Korchagina Elena Alekseevna
11.11.2013
Client Korchagina E.A. (Order №3256-1, Igumnovo village, Mozhaysky district, Moscow region, RUSSIA) gave mark “5”. No comments

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Soldatkina Natalia Leonidovna
07.11.2013
Client Soldatkina N.L. (Order №3426-1, gardeners' non-commercial partnership “Dubki”, Tsukanovo village, Mozhaysky district, Moscow region, RUSSIA) gave mark ”4” and left comments:

Positive: 
 -
Suggestions: 
 -
Negative: 
During the transportation the cover was torn.
 
Editor answer:
Dear Natalia Leonidovna! Plastic protective cover “MARSUPIO” has several objects. 1. To protect corrosion-resistant coat of the cistern during transportation. 2. After the gas tank is placed to the pit, to protect corrosion-resistant coat during seasonal ground movements and to drain from the body of the cistern vagabond currents which might occur in the soil. In spite of this break this cover can function in full measure.
 
 

 
Bobrov Georgy Vitalyevich
05.11.2013
Client Bobrov G.V. (Order №3274-2, Novorizhsky Oazis town, RUSSIA) gave mark “4”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Rudakov Sergey Nikolaevich
04.11.2013
Client Rudakov S.N. (Order №3522-1, Narofominsky district, Moscow region, RUSSIA) gave mark “4” and left comments:

Positive: 
Space saving, minimum volume of ground works during installation what reduces the mounting cost

Suggestions: 
 -
Negative: 
 -
 
 

 
Myasoedov Sergey Aleksandrovich
04.11.2013
Client Myasoedov S.A. (Order №3382-2, Kurovo village, Istrinsky district, Moscow region, RUSSIA) gave mark “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Leontyeva Olga Mikhailovna
02.11.2013
Client Leontyeva O.M. (Order №3474-1, Ulitino village, Odintsovsky district, Moscow region, RUSSIA) gave mark “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Matevosyan Vagram Robertovich
01.11.2013
Client Matevosyan V.R. (Order №3582-1, Nefedyevo village, Krasnogorsky district, Moscow region, RUSSIA)

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Zaykov Oleg Edislavovich
30.10.2013
Client Zaykov O.E. (Order №3238-1, gardeners' non-commercial partnership “Ostrovok”, Pobedilovo village, Privolzhsky District, Kazan region, RUSSIA) gave mark “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Laptev Grigory Olegovich
30.10.2013
Client Laptev G.O. (Order №3229-2, gardeners' non-commercial partnership “Lugovaya”, Golitsyn district, Moscow region) gave mark “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Ides Vladimir Yakovlevich
30.10.2013
Client Ides V.Y. (Order №3462-2, Khodaevo village, Chekhov district, Moscow region, RUSSIA) gave mark “4” and left comments:

Positive: 
Have not used yet

Suggestions: 
 -
Negative: 
 -
 
 

 
Abramyan Mikhail Lukyanovich
29.10.2013
Client Abramyan M.L. (Order №3550-1, Makarovo village, Leninsky district, Moscow region, RUSSIA) gave mark “2”. No comments

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Volkova Ekaterina Lvovna
29.10.2013
Client Volkova E.L. (Order №3462-2) gave mark “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Planidin Anatoly Vasilyevich
29.10.2013
Client Planidin A.V. (Order №3491-2, Zhukovsky, Ramensky district, Moscow region, RUSSIA) gave mark “5” and left comments:

Positive: 
Not too much time passed, for a moment everything is fine. We’ll see.

Suggestions: 
 -
Negative: 
 -
 
 

 
Yashin Aleksander Valeryevich
29.10.2013
Client Yashin A.V. (Order №3508-1, Naro-Fominsk, Naro-Fominsky district, Moscow region, RUSSIA) gave mark “3”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Iskornev Igor Petrovich
28.10.2013
Client Iskornev I.P. (Order №3427-3, gardeners' non-commercial partnership “Ozernaya”, Ruzsky district, Moscow region, RUSSIA) gave mark “2” and left comments:

Positive: 
Gas tank

Suggestions: 
Attitude to a client

Negative: 
If it’s “key ready” it should be “key ready”. I pay and watch but not chase after your manager.
I search the truck with sand, I negotiate concerning ground pickup. After the team leaves I repair the pavement and level a heap of the ground.
 
Editor answer:
Dear Igor Petrovich! Installation of independent gas supply system means organization of stable gas supply for your object according to the agreement and annexed estimates what was realized in full measure. Ground works were not included in this estimate.
 
 

 
Baykin Aleksander Gennadyevich
28.10.2013
Client Baykin A.G. (Order №3399-9, Ozeretskoye village, Sergievo-Posadsky district, Moscow region) gave mark “2” and left comments:

Positive: 
 -
Suggestions: 
 -
Negative: 
I was provided neither with operation documentation for the gas tank no with certificates.

Nobody called back for my claim concerning the water leakage to the hatchway of the gas tank!!!!

It’s not clear how to determine the level (quantity) of gas in the gas tank.
 
Editor answer:
Dear Aleksander Gennadyevich! All your equipment was provided with all necessary documentation. Exploitation and maintenance is made only by certified professionals. Your goal is to control filling level of the cistern according to the indications of the level detector and if necessary to order next charge. The offer concerning leakage clearing in the hatchway was sent to your e-mail address. The leakage is liquidated.
 
 

 
Polezhaeva Elena Afanasyevna
27.10.2013
Client Polezhaeva E.A. (Order №3385-6, gardeners' non-commercial partnership “Orbita”, Istrinsky district, Moscow region, RUSSIA) gave mark “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Burch Oksana Vasilyevna
26.10.2013
Client Burch O.V. (Order №3299-2, Selyatino village, Naro-Fominsky district, RUSSIA) gave mark “3”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Petrenko Aleksey Gennadyevich
25.10.2013
Client Petrenko A.G. (Order №3307/1-2, gardeners' non-commercial partnership “Zvezda”) gave mark “3”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Kolibab Alla Konstantinovna
25.10.2013
Client Kolibab A.K. (Order №3547/2-4, Nazaryevo town, Odintsovsky district, Moscow region, RUSSIA) have mark “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Dmitriev Gennady Petrovich
25.10.2013
Client Dmitriev G.P. (Order №3352-1, Troitskoye village, Odintsovsky district, Moscow region) gave mark “5” and left comments:

Positive: 
Alternative to natural gas

Suggestions: 
 -
Negative: 
 -
 
 

 
Yakovlev Aleksander Vladimirovich
24.10.2013
Client Yakovlev A.V. (Order №3480-2, Nikolo-Uryupino village, Krasnogorsky district, Moscow region, RUSSIA) gave mark “5” and left comments:

Positive: 
Thank you for the work. My special appreciations to Igor and his assistant. They did everything thoroughly.

Suggestions: 
 -
Negative: 
 -
 
 

 
Kuberskaya Natalia Sergeevna
24.10.2013
Client Kuberskaya N.S. (Order №3509-2, Kalyasin, Tver region, RUSSIA) gave mark “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Karpov Vladimir Nikolaevich
24.10.2013
Client Karpov V.N. (Order №3560-4, Pushkarka village, Naro-Fominsky district, Moscow region, RUSSIA) gave mark “4”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Torhachev Andrey Viktorovich
24.10.2013
Client Torhachev A.V. (Order №3577-1, Shcholkovo, Moscow region, RUSSIA) gave mark “1”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Kiselev Maksim Valentinovich
23.10.2013
Client Kiselev M.V. (Order №3379-1, Plaskinino village, RUSSIA) gave mark “5” and left comments:

Positive: 
There are not any questions to the gas tank itself, to its operating and mounting. All mentioned above is excellent!

Suggestions: 
 -
Negative: 
 -
 
 

 
Truhtanov Sergey Ivanovich
23.10.2013
Client Truhtanov S.I. (Order №3330-5, Vostryakovo town, Domodedov district, Moscow region, RUSSIA) gave mark “4”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Kravtsov Yury Ivanovich
23.10.2013
Client Kravtsov Y.I. (Order №3380-4) gave mark “5” and left comments:

Positive: 
It’s almost working “packaged” solution. This is a dictionary of IT professionals.

Suggestions: 
No need to make any improves.

Negative: 
Little bit expensive
 
 

 
Merkuryev Dmitry Aleksandrovich
23.10.2013
Client Merkuryev D.A.(Order №3281-3, Ukhta, Komi Republic, RUSSIA) gave mark “4” and left comments:

Positive: 
Quality

Suggestions: 
To make a heating for the fittings

Negative: 
Condensate formation in the second reducer gear box
 
Editor answer:
Dear Dmitry Aleskandrovich! In the conditions of especially cold climate at not big volumes of gas offtake the condensate in the second reducer gear box might appear. This problem is easily solved by blowdown.
 
 

 
Konovalov Igor Anatolyevich
23.10.2013
Client Konovalov I.A. (Order №3372/1-19) gave mark “1” and left comments:

Positive: 
 -
Suggestions: 
Make as it’s written on your website, bulb in bulb, because external surface is covered by protective coat +bag but inside it gets rusty.

Negative: 
 -
 
Editor answer:
Dear Igor Anatolyevich! Before the transportation a cistern is loaded by nitrogen to prevent formation of explosive gas-air composition during the first charge. Rust formation inside a gas tank is impossible because for metal oxidation it is required an oxygen which cannot appear inside.
 
 

 
Konovalov Igor Anatolyevich
23.10.2013
Client Konovalov I.A. (Order №3372-14) gave mark “1” and left comments:

Positive: 
 -
Suggestions: 
Don’t misinform the clients!

Negative: 
 -
 
 

 
Nesterov Maksim Sergeevich
23.10.2013
Client Nesterov M.S. (Order №3333/1-6, Zhostovo village, Mytishchensky district, Moscow region, RUSSIA) gave mark “4”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Btyantsev Sergey Nikolaevich
22.10.2013
Client Bryantsev S.N. (Order №3259-2, Solntsevo, Moscow, RUSSIA) gave mark “3” and left comments:

Positive: 
Price and availability of gas tank

Suggestions: 
I don’t know

Negative: 
During installation nobody controlled the depth of the pit, in the result it was installed too low, deep.
 
Editor answer:
Dear Sergey Nikolaevich! Signing a contract to realize independent gasification you were given an engineering assignment for ground works, where realizing and control you took upon yourselves. Small depth increase does not have any influence to the operating of the cistern itself.
 
 

 
Mantach Viktoria Viktorovna
22.10.2013
Client Mantach V.V. (Order №3243-3, Alekseevo village, Moscow region, RUSSIA) gave mark “4” and left comments:

Positive: 
Gas tank is cool!

Suggestions: 
 -
Negative: 
I should have been prevented that gas would finish in 2 months. It’s so inconvenient to charge in the winter, especially in the autumn.
 
Editor answer:
Dear Viktoria Viktorovna! Gas consumption is a rate individual for each gasified object and it is a subject to be statistically forecasted only on base of the information from previously maintained objects. It depends on many factors, in particular: efficiency of heating system, coldproof of the construction, the quantity of people who live there, the quantity and total capacity of gas appliance and so o n.
 
 

 
Shalaturkina Olga Nikolaevna
22.10.2013
Client Shalaturkina O.N. (Order №3500-3, Pershutino village, Klinsky district, Moscow region, RUSSIA) gave mark “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Oleg
03.02.2013
Installed in August 2012. 100% prepayment, delivery within agreed-upon time limits - 3 days (Kazan), they did not quit on! A set made me happy; I was even provided with a shampoo to make test for gas leakage. The temperature has not gone yet lower than -27, everything operates well, there are no any problems. Consultation and delivery was organized by Erokhin Andrey Vladimirovich. Thank you!
 
 

 
Gennady
19.12.2012
Installed on the 30th of November, 2012; for a moment everything is fine. I took 2 weeks vacations especially for it. Now I watch how I will live out from 20 degrees frosts. Guys, thank you so much! For their appropriate and heroic getting over from all the difficulties connected with starting up of all gas supply system. Special acknowledgment to manager Krasnov Sergey Vladimirovich.
 
 

 
Andrey
30.10.2012
During the winter all butane and other fractions really burn out up to 0% mark of lever meter. Gas pressure is stable up to complete emptiness of the barrel even when the boiler operates with full power. This is the third year when my neighbor has been using what is known “Czech” horizontal gas tank with extended necktube. As a result, each winter gas really suddenly “finished“ at minimum rate indicated on the detector 12% for the first time and 17% and 23% in the following winters. First, he thought that that was indicator which didn’t work correctly. But charging it to have gas completely worked out after summer is over. And what do you think? Summer indicator read out at the moment of gas exhaustion were 0-1%. My vertical Antonio Merloni has been “dying” for two consecutive years now when the arrow of the detector “is off the scale”, lower than 0%. So, whether it is marketing or not, I don’t regret that I bought this vertical barrel for the price which is little bit lower than the price of neighbors’ gas tank although almost twice smaller that the neighbors’ one. Recently I found an office which charges supposedly almost only by butane which has significantly higher heat output than propane. Of course, I cannot make lab confirmation of gas composition at home. But thanks to statistics of use we’ll check if it’s really pure butane. But neighbor’s butane always stays unburnt in the barrel.
 
Editor answer:
We appreciate your high opinion about our equipment! Hope that in the future you will get only positive emotions using gas tank from Antonio Merloni.
 
 

 
Oleg
20.09.2012
I forgot to correct stars – Five points to your company!!!!
 
 

 
Oleg
20.09.2012
Good guys – advised, delivered and installed – everything is fine, nothing bothered. When everything is fine there is nothing to write. Good luck to them and to all the clients of the company. Thank you for the work. And special acknowledgment to manager Krasnov Andrey! People, chose him to be your manager!
 
 
 
Газгольдер подземный вертикальный

Vertical underground gas tank

5000 litre

Comments (25)
 
 

 
Алексей
26.05.2015




An english version is not available
 
 

 
Сверчков Юрий Петрович
14.02.2015




An english version is not available
 
 

 
Sokolova Ekaterina Petrovna
18.12.2014
Client Sokolova E.P. (Order №3821-9, Gorki village, Kaluga region, RUSSIA) gave “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Protas’ Ivan Ivanovich
27.08.2014
Client Protas’ I.I. (Order №3721-2, Detkovo village, Chekhovsky district, Moscow region, RUSSIA):

Positive: 
Qualification of the workers, ability and wish to bring the project to logical conclusion.

Suggestions: 
 -
Negative: 
 -
 
 

 
Zubareva Tatiana Valentinovna
26.05.2014
Client Zubareva T.V. (Order №3673-3, Belaya Kolp’ village, Shakhovsky district, Moscow region, RUSSIA) gave mark “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Lubchenko Vladimir Sergeevich
11.04.2014
Client Lubchenko V.S. (order №3664-9, Rostov-on-Don, Proletarsky district, Rostov region, RUSSIA) gave mark “4”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Dryakhkov Eduard Valeryevich
09.12.2013
Client Dryakhlov E.V. (order №3512-1, Kirishi, RUSSIA) gave mark “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Kulibabin Vadim Aleksandrovich
21.11.2013
Client Kulibabin V.A. (Order №3588-5, Zelenogradsky town, Pushkin district, Moscow region, RUSSIA) gave mark “4”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Ovezov Arslan Kakadzhananovich
03.11.2013
Client Ovezov A.K. (Order №3222/2-7, Nazaryevo village, Narofominsky district, RUSSIA) gave mark “4”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Agafonov Vladimir Viktorovich
31.10.2013
Client Agafonov V.V. (Order №3230-2, Ropsha town, Lomonosov district, Leningrad region, RUSSIA) gave mark “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Boyko Viktor Vasilyevich
31.10.2013
Client Boyko V.V. (Order №3226-1, Sen’kino village, Lipetskoye rural settlement, Serpukhovsky municipal district, Moscow region, RUSSIA) gave mark “4”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Mavlonazarov Sultonsaid Kadamsaidovich
31.10.2013
Client: Mavlonazarov S.K. (order №3225-2, Yuzhnoye Butuvo, Moscow) gave mark “2” and left comments:

Positive: 
 -
Suggestions: 
 -
Negative: 
Gas tank was installed; I called your company with reclamation concerning gas leakage. That was 2-3 weeks ago, your professionals have not still came and have not still solved the problem.
 
Editor answer:
Dear Sultonsaid Kadamsaidovich! Gas leakage was eliminated 20.11.2013.
 
 

 
Rodin Oleg Mikhailovich
30.10.2013
Client Rodin O.M. (Order №3545-1, Kaluga, Kaluga region, RUSSIA) gave mark “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Subbotin Aleksander Gennadyevich
29.10.2013
Client Subbotin A.G. (Order №3494-5, Sovhoz Arhangelskiy town, Naro-Fominsky district, Moscow region, RUSSIA) gave mark “4” and left comments:

Positive: 
For a moment everything is fine; the time will tell.

Suggestions: 
 -
Negative: 
 -
 
 

 
Tsaritov Avedik Zaurovich
28.10.2013
Client Tsaritov A.Z. (Order №3322-5, Marushkinskoye rural settlement, Naro-Fominsky district, Moscow region) gave mark “4”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Antsupova Maria Nikolaevna
28.10.2013
Client Antsupova M.N. (Order №3326-1, Ermolino village, Moscow region, RUSSIA) gave mark “1”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Skochko Irina Vladimirovna
27.10.2013
Client Skochko I.V. (Order №3450-1, Krasnye Orly, Chekhovsky district, Moscow region, RUSSIA) gave mark “3”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Slobodina Natalia Fedorovna
23.10.2013
Client Slobodina N.F. (Order №3278/1-6, SNT “Puls”, Instrinsky district, Moscow region, RUSSIA) gave mark “4” and left comments:

Positive: 
Warm, operates noiseless, I don’t have any complaints to the gas tank itself.

Suggestions: 
 -
Negative: 
Radiator layout is made not quit neat, cooling liquid leaks a little bit, we called professionals twice.
 
Editor answer:
Dear Natalia Fedorovna! Antifreeze has high flow ability. Using antifreeze in the systems of hydronic heating is not recommended by the producers of gas heating equipment because encapsulated components there are considered to be used with distilled water which has lower flow coefficient. Engineers from our company recommend not to use heating systems which operate on liquid heat carriers.
 
 

 
Demeshko Aleksander Yuryevich
22.10.2013
Client Demeshko A.Y. (Order №3242-1, Novosibirsk, RF) gave mark “1”. No comments

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Andrey Tegin
02.08.2013
Dear competitors! Of course we understand your nerves. )) And we also understand that it’s hard to compete with Antonio Merloni products which have the best price and quality combination. But please, allow the clients to make a choice by themselves. In countries with warm client there are used horizontal ground based gas tanks; and especially for regions with temperatures which drop down lower than 20 degrees there were designed vertical underground cisterns.
 
 

 
Moderators, hello?!
31.07.2013
People, who were graded by “2” for physics at school – don’t take THIS! People, who had at least “3”, will understand by themselves that these barrels are only for mild Italian client.
 
 

 
Sand
01.07.2013
It’s extremely pleasant to be put on the lot of Viktor
 
 

 
Uzbeks
11.02.2013
We also liked very much to work with Viktor
 
 

 
Maksim
19.12.2012
That’s pity that this Viktor is false because we, his neighbors, would have explained him that it was not good to be happy that the neighbor had something worse. Time will tell.
Viktor’s neighbors
 
 

 
Viktor CHT Scherbinka2
24.10.2012
Installed on the 4th of October 2012. Charged 4300L. For a moment everything is fine. Looks very nice. Of course it came more expensive than to my neighbors with their Czech gas tanks. But they are sorry now that they didn’t know about vertical gas tanks because their lots were smashed to install horizontal cisterns. Probably they will regret more in winter. Money will be forgotten but the quality will stay. To divide it for 50 years of use, not expensive at all. The pit and the trench were made by Uzbeks for 2 days for 13000 rubles (700 rub.per cube) with ground removal for 50 meters from the lot. The cistern cost 413000 rubles. Sand for filling operations – 6000 rubles, to charge 4300L by gas cost 68800 rub. Uzbeks covered by sand and 20 cm by black soil for 2000 rubles. Total cost: 502800 rubles.
 
 
 
Газгольдер подземный вертикальный

Vertical underground gas tank

1650 litre

Comments (6)
 
 

 
Mishakov Oleg Grigoryevich
29.11.2013
Client Mishakov O.G. (Order №3598-5, Nikolskoye village, Moscow region, RUSSIA) gave mark “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Lopatin Ivan Aleksandrovich
01.11.2013
Client Lopatin I.A. (Order №3596-1, Trufanovka village, Odintsovsky district, Moscow region, RUSSIA) gave mark “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Kraynov Vladislav Viktorovich
31.10.2013
Client Kraynov V.V. (Order №3235-1, Charkovo village, Sergiyevo-Posadsky district, RUSSIA) gave mark “4”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Knyazev Aleksander Nikolaevich
28.10.2013
Client Knyazev A.N. (Order №3272-10, Krasnogorsk, Moscow region, RUSSIA) gave mark “5”. No comments.

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 

 
Skoropadsky Aleksander Aleksandrovich
27.10.2013
Client Skoropadsky A.A. (Order №3273/1-4, “Siren” gardening, the 37th km of Vyborg highway, Leningrad region, RUSSIA) gave mark “5” and left comments:

Positive: 
1. Installation on the lot takes small space
2. Preparing, it’s not necessary to dig up a half of lot.
3. Gas evaporating is realized almost till zero; at the same time it is enough to have minimum pressure for boiler operating.
4. Tools installed on the gas tank allow to control gas flow rate to charge it again on time.

Suggestions: 
 -
Negative: 
 -
 
 

 
Vorobyev Oleg Viktorovich
24.10.2013
Client Vorobyev O.V. (Order №3282-2, Vnukovo-3 town, Leninsky district, Moscow region) gave mark “3”. No comments

Positive: 
 -
Suggestions: 
 -
Negative: 
 -
 
 


Cart  

No products

Total 0,00 €

Check out

Site Search

© 1998-2017 GC "Terrikom". All rights reserved.

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Crediting
 X
Закажите обратный звонок

Наш сотрудник позвонит и ответит на ваши вопросы. Это быстро и бесплатно!

Заказать звонок